Skip to content

Project Portfolio

Residential and commercial projects shaped by planning, precision and buildability.

Our portfolio reflects experience across new builds, addition & alteration works, design-and-build delivery and technically complex urban construction environments.

Design & Build
2024

65 Duchess Road

Proposed erection of 2-storey envelope control semi-detached dwelling house with an attic on Lot 01602A MK 02 at 65 Duchess Road, Singapore 269001 (Bukit Timah planning area)

New build semi-detached residence delivered as part of T2 Construction’s recent landed housing portfolio.

A&A
2025

101 Mimosa Crescent

Proposed Alternations/Additions to An Existing 2-Storey Detached House with an Attic on Lot 05588A MK 18 At 101 Mimosa Crescent Singapore 808048

Addition & alteration works for a detached residence, demonstrating technical coordination in an occupied neighborhood context.

Design & Build
On-going

675A East Coast Road

Proposed…

A semi-detached project combining design-and-build coordination with addition & alteration expertise.

Rebuild
On-going

9 Third Street

Proposed…

Corner terrace project managed through structured planning, site logistics and client-focused delivery.

Design & Build
On-going

21 Daisy Road

Proposed…

Integrated design-and-build corner terrace project showcasing coordination between planning and on-site execution.

Rebuild
On-going

71 University Road

Proposed erection of 2-storey envelope control semi-detached dwelling house with an attic on Lot 01857P MK 17 at 71 University Road, Singapore

A semi-detached project combining design-and-build coordination with addition & alteration expertise.

Design & Build
On-going

448 Race Course

Proposed…

Corner terrace project managed through structured planning, site logistics and client-focused delivery.

More Completed Main Con Projects...

S/N

Project

Stakeholder

Year

1

Proposed erection of a 2 storey intermediate terrace house with at attic at No. 28 Jalan Adat

William Lau Architects

2005

2

Proposed new erection of a 2-storey intermediate terrace dwelling house with a new attic at No. 72 Siglap Drive

William Lau Architects

2006

3

Proposed erection of a 2 storey intermediate dwelling house with an attic at No. IO Jalan Sentosa

William Lau Architects

2009

4

Proposed new erection of a 2 storey comer terrace dwelling house at No. 37 Toh Tuck Terrace

William Lau Architects

2010

5

Proposed reconstruction of ext’g 3 storey semi-detached house with an attic at No. 663 Changi Road

Xcube Architects

2011

6

Proposed reconstruction to the existing 2 storey intermediate terrace dwelling house with an attic at 38 Bedok Terrace

EDP Consultants Pte Ltd

2012

7

Proposed reconstruction of the ext’g 2 storey semi-detached dwelling house with provision for a new attic at 22 Sunbird Road

A Rare Studio International

2013

8

Erection ofa 3-storey envelope control intermediate terrace dwelling house with an attic at 212 Carpmael Road

X.Pace Design Group

2019

9

Proposed change of use of part of 1st storey production area and mezzanine floor ancillary office to secondary workers. dormitory (for 72 workers) in the existing single-storey single-user industrial development with mezzanine floor on Lot 00670T MK 07 at 17 Pioneer Sector 2

Hoo Huat Engineering Pte Ltd

2024

10

Proposed Additions & Alterations to an existing 2-storey semidetached dwelling house on Lot 05498X MK04 at 83A Namly Drive Singapore 267486

Mr. Lua Kok Leong

2024

11

Proposed change of use of part 2nd storey production area & 3rd storey production area and ancillary office to ancillary workers’ dormitory (for 72 workers) at the existing 3-storey industrial building with approved ancillary office on Lot 02707L MK06, 33 Kian Teck Way (Jurong West Planning Area)

Ebenezer NDT Services Pte Ltd

2024

12

Proposed addition and alteration works to the existing 3-storey intermediate terrace dwelling house on lot 07633P MK 26 at 56 Lor H Telok Kurau Singapore 426063

Mr.Tan Kai Xuan Keith

2025

13

Proposed addition and alteration works to the existing 2-storey detached dwelling house on Lot 02811A MK 04 at 25 Namly Crescent Singapore 267540

Mr. Choo Wan Ling

2024

14

Proposed addition and alteration works to the existing 3-storey intermediate terrace dwelling house on Lot 01647A MK 27 at 71 Jln Bangsawan

Mr. Koh Meng Han

2025

Off-form Concrete

Project Name

Proposed…

RC Work

Project Name

Proposed…

Partition Wall

Project Name

Proposed…

Painting

Project Name

Proposed…

Drain Work

Project Name

Proposed…

Bridge RC Work

Project Name

Proposed…

Brick & Plaster Work

Project Name

Proposed…

Demolition

Project Name

Proposed…

ERSS

Project Name

Proposed…

Road Work

Project Name

Proposed…

Tiling Work

Project Name

Proposed…

Waterproofing Work

Project Name

Proposed…

Building Work

Project Name

Proposed…

Reinstatement

Project Name

Proposed…

Renovation

Project Name

Proposed…

Renovation

Project Name

Proposed…

More Completed Subcon Projects...

S/N

Project

Type

Stakeholder

Year

1

Proposed new erection of a 2-storey envelope control corner terrace house with attic on Lot 98817K MK18 at 87 Bridport Avenue (Serangoon planning area)

RC Sub

Sing Tatt Construction Pte Ltd

2022

2

Proposed additions 7 alterations to provide new swimming pool at 2nd storey of the existing 2- storey semi-detached dwelling house with an attic on Lot 06149C MK 18 at No.1 Thomson Heights

Total Sub

Innovez Engineering Pte Ltd

2023

3

Proposed erection of a 3-storey envelope control detached dwelling house with attic and swimming pool on Lot 02073A MK02 at 148 Coronation Road (Bukit Timah planning area)

Dem. Sub

OAL Builder Pte ltd

2023

4

Proposed new erection of a 2-storey envelope control semi-detached dwelling house with attic on Lot 98331N MK18 at 45 Huddington Avenue Singapore 557615 (Serangoon planning area)

Total Sub

T2 Design & Contract Pte Ltd

2023

5

Proposed new erection of a 2-storey envelope control semi-detached dwelling house with mezzanine, attic and a swimming pool on Lot 97782M MK18 at 38 Bodmin Drive (Serangoon planning area)

RC Sub

Atat.1 Construction Pte Ltd

2023

6

Proposed new erection of 3 units of 2-storey envelope control detached dwelling house with basement, attic and a swimming pool on Lot 96753P MK17 at 124 University Road (Novena planning area)

RC Sub

Atat.1 Construction Pte Ltd

2023

7

Proposed new erection of a 3-storey envelope control corner terrace dwelling house with mezzanine and attic on Lots 03926L MK26 at 10 Lorong L Telok Kurau Singapore 425428

Dem. Sub

XY F&S Builder

2023

8

Proposed new erection of a 3-storey envelope control detached dwelling house with a basement, attic and swimming pool on Lot 97054v MK25 at 18B Fort Road (Marine Parade planning area)

RC Sub

Atat.1 Construction Pte Ltd

2023

9

Proposed new erection of a 2-storey envelope control detached dwelling house with a basement, an attic and swimming pool TS25 on Lot 00814p at 12 Lewis Road, Singapore 258598 (Tanglin planning area)

Dem. Sub

OAL Builder Pte ltd

2023

10

Proposed reconstruction of existing 1-storey detached dwelling house to a 2-storey envelope control detached dwelling house on Lot 94580M MK26 at 25 Siglap View, Singapore 455792 (Bedok Planning)

RC Sub

Everridage Construction Pte Ltd

2023

11

Proposed amendment to approved st01 for proposed erection pf a 3storey detached dwelling house with a swimming pool on parcel (B220) Lot 1473K MK 34 at 54 Lakeshore View Sentosa Cove (Southern Islands Planning Area)

RC and some arch work Sub

OAL Builder Pte ltd

2024

12

Hard Rock Hotel, as part of Resorts World Sentosa development

Road Work Sub

Deshin Engineering & Construction

2025

Technical challenges become manageable when addressed early.

T2 Construction emphasizes early method statements, professional engineer endorsements where required, and site-specific mitigation planning to support smoother delivery on complex jobs.

Planning

Detailed project schedules, procurement flow and milestone tracking keep teams aligned from pre-construction through handover.

Site Logistics

Material storage, worker flow, access control and temporary facilities are planned to optimize productivity on constrained sites.

Mitigation

Potential challenges are identified early so construction methods, permits and safety controls can be resolved before they disrupt progress.